
Place purchase orders or get accurate information, including copies of invoices, order histories and stock levels online, 24 hours a day.
Please return to the main page to login.
Designing a LEED® Project? Going
Green? Use our products to earn LEED credits in water efficiency,
wastewater management and stormwater management.
Looking for a way to stop septic odors coming from your septic tank?
The Wolverine® Brand Vent filter is a powerful septic vent odor control filter designed to
eliminate septic and sewer gas odors in residential, light industrial or commercial applications.
Looking for somewhere to buy a Handler®?
Click here for a list of Handler® distributors and dealers near you.
Do you have a very difficult underground tank
application that includes a high water table, extreme depths or traffic
loads? Get on board patented Tanksmart™ technology.
Onsite goes beyond tanks. We now stock a
wide range of Polylok onsite accessories, including lids, risers, field
accessories, effluent filters and more. Additonally, we are pleased to supply
the Alberta onsite market ARC chambers by Hancor.
Onsite Wastewater Treatment Systems are the future of the
onsite industry, and Bionest is at the leading
edge. Clean water systems for households and
developments are available now.
Are you ready for 2010 when all fuel slip tanks must
be Transport Canada certified? Get on board now with an Enviroslip
premium dual wall fuel slip tank. Click here to find out why this will save you
money in the long run.
ADS Arc Leachfield (Septic Field)
ChambersLeaching chambers are rapidly becoming the product of choice for leachfield applications over conventional pipe and gravel systems. Their lightweight construction offers lower installed costs and less intrusive installations.
The Arc™ septic leaching chamber is a sturdy, lightweight plastic unit that combines maximized infiltrative surface area and storage capacity with an improved structural design to handle most any conventional leachfield system challenge without sacrificing performance. This unique combination allows for increased effluent dispersal performance and improved structural integrity as well as ease of installation and simplified contouring capabilities.
• Injection–molded from High Density Polyethylene (HDPE) for
lightweight and sturdy design
• 20–degree integral articulating joint that is ideal for either
straight or contoured septic leachfield applications
• True corrugated chamber design eliminates flat surfaces and provides
increased load bearing capability in the trench
• Designed to accommodate both gravity–fed and pressure–dosed
systems
• “Lock and Drop” joint provides a more positive connection
during installation and backfill
• A universal inlet/outlet end cap
• Inspection vent ports on every unit with easy–to–remove
knockouts for maximum job site flexibility
• Convenient five–foot lengths are easy to handle
• Quickly installed by one person into three–foot wide trench or bed
applications
• Increased plumbing option with Side Port Coupler component which snaps
in place to allow side entry at any joint throughout the trench line.
• Diamond plate texture increases slip resistance and enhances ease of
installation
This specification describes the Arc chamber units for use in onsite wastewater disposal applications.
Arc™ chambers are manufactured from high-density polyethylene with an open bottom, solid top and louvered sidewalls. Sidewall louvers shall be designed to minimize soil intrusion. Chamber shall meet the load rating of H-10 (16,000 lb per axle) with a minimum of 12 inches of cover when tested in accordance with IAPMO PS 63 and installed in accordance with manufacturers installation procedures.
Each chamber shall interlock with an integral articulating joint. Articulating joints shall have a free range of horizontal rotation of 20 degrees, with a maximum of 10 degrees in either direction. Articulating joint shall be constructed by placing the dome with engaging knuckle of the incoming chamber over the post end of the previously–installed chamber, with final engagement occurring when the lower base flanges of the incoming chamber under-lap the raised base flanges of the previously-installed chamber.
Each chamber shall be manufactured from high-density polyethylene as defined and described in IAPMO PS 63.
Installation shall be in accordance with ADS installation procedures and those issued by the local health department regulations.